THE PROJECT

This comprehensive scheme involved the removal of existing rooms, ceilings, and floor coverings, followed by the installation of new toilet facilities, ceilings, and lighting. The goal was to create a modern, collaborative, and versatile workspace that meets the evolving needs of the client at 120 Colmore Row

CLIENT: AHWL
PROJECT: CAT A PLUS DESIGN & BUILD
DURATION: 5 WEEKS
SIZE: 1,732 SQFT

THE WORK

Strategic Removal and Installation: The project began with a meticulous strip-out process, removing outdated rooms, ceilings, and floor coverings to lay the foundation for a fresh and innovative workspace. Estilo Interiors then implemented a strategic installation plan, introducing new toilet facilities, ceilings, and state-of-the-art lighting systems.

Furniture Solutions for Collaboration: Recognising the importance of collaborative work environments, Estilo Interiors curated a variety of furniture solutions to enhance different areas of the 4th floor. This included dedicated spaces for collaboration, one-to-one working, and meetings. The selection of furniture not only promotes functionality but also contributes to the overall aesthetic coherence of the space.

Attention to Detail: Every aspect of the fit-out was executed with precision and attention to detail. From the installation of new ceilings to the integration of modern lighting solutions, Estilo Interiors ensured that each element contributed to the overall enhancement of the workspace.

Versatility and Functionality: The design philosophy behind the 4th floor fit-out prioritised versatility and functionality. The new layout ensures that the space is adaptable to various work styles, providing areas for focused individual work as well as collaborative team activities. This adaptability is crucial in accommodating the diverse needs of a modern workforce.