THE PROJECT
Estilo Interiors were appointed by James Allen’s Girls’ School (JAGS) to deliver two significant refurbishment projects as part of their ongoing investment in modern, safe and efficient educational environments. Our team delivered both the major upgrade of the school’s catering facilities and the structural renovation and expansion of the medical department, ensuring each space meets contemporary standards for hygiene, safety, accessibility and operational efficiency.
We worked closely with the school’s leadership, catering team and medical staff to ensure both projects aligned with the school’s operational needs while minimising disruption to day-to-day activity.
Medical Facilities Renovation & Expansion
Estilo Interiors delivered a full renovation and expansion of JAGS’ medical facilities — creating a modern, private and compliant healthcare environment for pupils and staff.
Key Objectives
-
Expand the medical department footprint and reconfigure internal rooms.
-
Improve confidentiality through enhanced acoustic performance.
-
Replace outdated infrastructure and ensure compliance with current medical, fire safety and building standards.
-
Create a safe, hygienic and functional environment suitable for treatment, consultation and welfare support.
Scope of Works
Demolition & Strip-Out
-
Full removal of internal stud walls, partitions and redundant M&E services.
Design Doc – Jan 2025
-
Safe removal of a mezzanine cavity following structural assessment.
-
Removal of outdated finishes and floor coverings.
Asbestos Removal
-
Licensed removal of asbestos-containing materials, following the school’s Asbestos Management Plan.
-
Full clearance certification prior to new construction works.
Structural & Partitioning Works
-
Structural reinforcement where necessary to support the new layout.
-
Construction of new metal stud partitions with Rw 50dB acoustic insulation.
-
Installation of solid-core acoustic doors with drop seals for privacy.
Mechanical & Electrical Upgrades
-
Installation of new power, data, LED lighting and fire alarm integrations.
-
Mechanical ventilation upgrades in line with Building Regulations Part F.
-
New extract ventilation in treatment spaces and staff areas.
-
Fire safety improvements including FD30/FD60 fire doors, compartmentation works and alarm upgrades.
Internal Finishes & Compliance
-
Durable, hygienic wall finishes including washable paint and wall cladding in clinical areas.
-
Non-slip vinyl flooring with coved skirting throughout medical rooms.
-
New suspended ceilings with acoustic tiles.
-
All works delivered in accordance with Building Regulations, BS fire codes and the Control of Asbestos Regulations.
The newly expanded medical suite provides a private, calm and highly functional space that supports the wellbeing of pupils and staff. Acoustic upgrades ensure confidentiality, while improved lighting, ventilation and finishes create a hygienic, compliant and welcoming clinical environment.
Catering Facilities Refurbishment
The catering project focused on modernising the school’s main kitchen to improve workflow efficiency, expand production capacity, and replace ageing infrastructure. Delivered in close consultation with the Catering Manager and Executive Chef, the works were designed to future-proof the school’s food service capability.
Key Objectives
-
Replace outdated equipment with high-efficiency modular catering appliances.
-
Improve hygiene, safety standards and durability of finishes.
-
Enhance operational layout, workflow and storage.
-
Upgrade mechanical, electrical and ventilation services to support modern catering demands.
Scope of Works
Kitchen Equipment & Workflow Enhancements
-
Installation of new high-output modular cooking equipment to improve service speed and capacity.
-
Reconfiguration of preparation, cooking and wash-up zones based on operational workflow analysis.
-
Improved energy efficiency through updated induction and electric appliances.
Flooring, Walls & Ceiling
-
Removal of damaged flooring and installation of new non-slip safety vinyl for improved hygiene and durability.
-
Reinforced subfloors installed in high-load zones.
-
Installation of full-height hygienic wall cladding (Altro Whiterock or equivalent) across all prep and cooking areas.
-
Ceilings repainted using antimicrobial, moisture-resistant coatings.
-
New LED lighting for better visibility and reduced energy consumption.
Services & Compliance Upgrades
-
Enhanced electrical capacity to support new equipment loads.
-
Ventilation and extraction modifications to accommodate revised cooking layout.
-
Adjusted plumbing and drainage to ensure reliable water supply and proper gradients.
-
Fire suppression system upgrades to match new equipment and layout.
The refurbished kitchen provides a safer, more efficient and fully compliant catering environment. Enhanced workflow, new equipment and durable finishes ensure the school can deliver a high-quality food offering while reducing maintenance issues and long-term energy costs.